Actions
Action FLOOD-10-a: Coordinate with the Sacramento-Yolo Mosquito and Vector Control District in the design and installation of underground cisterns and other drainage facilities to reduce and treat vectors. Status: Not Started.
Action FLOOD-10-b: Expand public outreach and education through multiple forms of media (e.g., radio, television, social media) to reduce standing water in areas that attract mosquitos. Include information regarding methods of protection (e.g., covering up, use of sprays). Status: Not Started.